Paint shopPony Luxury Coating
Pony L11000 (11x5x5)
Paint shop
Pony Luxury Coating
Pony L11000 (11x5x5)
Preț fix plus TVA
81.250 EUR
An de fabricație
2025
Stare
Nou
(complet funcțional)
Locație
Würzburg 

Date de bază
- Denumirea mașinii:
- Paint shop
- Producător:
- Pony Luxury Coating
- Model:
- Pony L11000 (11x5x5)
- An de fabricație:
- 2025
- Stare:
- nou
- Funcționalitate:
- complet funcțional
Preț și locație
Preț fix plus TVA
81.250 EUR
- Locație:
- Schulstr 3, 97084 Würzburg, Deutschland

Sunați
Detalii tehnice
Dimensiuni și greutate
Lungime totală:
11.200 mm
Lățime totală:
5.100 mm
Înălțime totală:
5.600 mm
Înălțime interioară:
4.970 mm
Lungime interioară:
11.000 mm
Lățime interioară:
5.000 mm
Motor și cutie de viteze
Combustibil:
gaz petrolier lichefiat (GPL)
Detalii despre putere
Tensiune de intrare:
380 V
Frecvență de intrare:
50 Hz
Consum de energie:
45 kWh
Tip de curent de intrare:
trifazat
Echipament
Iluminat
Documentație și certificare
Durata garanției:
24 luni
Materiale/produse procesabile
Grosimea max. a tablei din oțel:
2 mm
Mai multe detalii
Putere:
45 kW (61,18 CP)
Cerință de aer:
52.000 m³/h
Capacitate de încălzire:
250 kW (339,91 CP)
Grosimea izolației:
50 mm
Putere nominală:
250 kW (339,91 CP)
Temperatură:
80 °C
Detalii despre ofertă
- ID anunț:
- A19572531
- Actualizare:
- ultima dată la 15.01.2026
Descriere
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
Djdpfewzl Hxjx Anmscp
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Anunțul a fost tradus automat. Pot exista erori de traducere.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
Djdpfewzl Hxjx Anmscp
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Anunțul a fost tradus automat. Pot exista erori de traducere.
Documente
Furnizor
Notă: Înregistrați-vă gratuit sau conectați-vă, pentru a accesa toate informațiile.
Înregistrat din: 2025
6 Anunțuri online
Trimite solicitare
Telefon & Fax
+49 931 4... anunțuri
Aceste anunțuri v-ar putea interesa și pe dumneavoastră.
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Petershagen
1.495 km
Semiremorcă cu platformă joasă
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Gabelstapler/Arbeitsbühnentransporter Klapprampe
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Kežmarok
618 km
Tunel de uscare UV
SuperficiEssiccatoio UV
SuperficiEssiccatoio UV
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Deskle
1.134 km
Unitate de sablare
COGEIMPG 10x15
COGEIMPG 10x15
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Gütersloh
1.519 km
Mașină de îndoit rotund Stölting RA 2000 x 8 mm
StöltingRA 2000 x 8 mm
StöltingRA 2000 x 8 mm
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Friesenheim
1.529 km
Mașină de îndoire rotundă
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
HaeuslerEVO 31031 4-Walzen Blechbiegemaschine
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Deskle
1.134 km
Unitate de sablare
TECNOBLASTGHIBLI 500 S - 9x13
TECNOBLASTGHIBLI 500 S - 9x13
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Finlanda
1.624 km
Unitate de sablare
Gietart
Gietart
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Büyükkayacık OSB
1.105 km
Mașină care transportă semiremorcă
LiderTruck Carrier 1
LiderTruck Carrier 1
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Eisenberg (Pfalz)
1.511 km
Instalație de acoperire cu pulbere
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Gema, CaldanMagic Compact BA04, Hängebahnanlage Powe
Reușit
Mesajul dvs. a fost trimis.
Anunț mic
Würzburg
1.376 km
Magazin de vopsea
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
Anunțul dvs. a fost șters cu succes
A apărut o eroare































































































